DC1

Dataset File
Description

Dataset proposed in the paper Vanhoucke, M., Coelho, J., and Batselier, J. (2016). An overview of project data for integrated project management and control. Journal of Modern Project Management, 3(2):621.

Number of instances
1800
Format
rcp
Statistics
Set statistics:
Number of instances: 1800
- Solved (exact proc.): 1800 (100.00%)
- Closed (LB=UB): 1800 (100.00%)
- Open (LB<UB): 0 (0.00%)
Average deviation over CPM:
- Lower bound: 26.57%
- Upper bound: 26.57%
Sum of lower bounds: 183533
Sum of upper bounds: 183533
Open time units: 0 (0.00%)
Avg CPU lower bounds: 0.009s (max 1.100s)
Avg CPU upper bounds: 0.009s (max 1.100s)
Avg CPU optimal sol.: 0.009s (max 1.100s)
Reference 1:
- Lower bounds: 1410 (78.33%)
- Upper bounds: 1770 (98.33%)
- Optimal solutions: 1800 (100.00%)
RecordSets
Record sets:
ID;1
Author(s); Demeulemeester, E. and Herroelen, W.
Reference; Demeulemeester, E. and Herroelen, W. (1992). A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38:1803-1818.
Date; 1992/01/01
Hardware / software; Stevin Supercomputer Infrastructure, C++, compiler intel/2017.02, Linux
Stop criteria; 60 second(s)
Submission date; 2017/5/19
Relevant Results
File Header
Title;DC1
Description;Dataset proposed in the paper Vanhoucke, M., Coelho, J., and Batselier, J. (2016). An overview of project data for integrated project management and control. Journal of Modern Project Management, 3(2):621.
Number;1800
Format;rcp
Date