DC1_DH

Results File
Dataset
File Header

Author(s): Demeulemeester, E. and Herroelen, W.
Reference: Demeulemeester, E., & Herroelen, W. (1992). A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem. Management Science, 38(12), 1803-1818. http://www.jstor.org/stable/2632711
Date: 1992/01/01
Hardware / software: Stevin Supercomputer Infrastructure, C++, compiler intel/2017.02, Linux
Stop criteria: 60 second(s)
Submission date: 2017/5/19

Statistics
New results:
1410 new lower bounds
1770 new upper bounds
1800 new optimal solutions
420 new closed instances
2760 open instances updates (upper and lower bounds)
Results saved in sites/default/files/datasets/DC1.csv
BKS saved in sites/default/files/datasets/DC1_BKS.csv
Instances: 1800
Optimal results: 1800 (100.00%)
Upper Bounds: 1800
- Average deviations:
- over CPM: 26.57%
- over best LB: 0.00%
- over best UB: 0.00%
- Best Known: 1800 (100.00%)
- Closed (using best LBs): 1800 (100.00%)
- Sum of time units: 183533
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Lower Bounds: 1800
- Average deviations:
- over CPM: 26.57%
- below best LB: 0.00%
- below best UB: 0.00%
- Best Known: 1800 (100.00%)
- Closed (using best UBs): 1800 (100.00%)
- Sum of time units: 183533
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Date