RG300_CV24c

Results File
Dataset
File Header

Author(s): Coelho, Jose and Vanhoucke, Mario
Reference: Coelho, Jose and Vanhoucke, Mario. 2024. Working paper 'Comparing and extending satisfiability solution methods for the resource-constrained project scheduling problem'
Date: 2024/10/20
Hardware / software: STEVIN HPC-UGent infrastructure, C++, compiler intel/2017.02, Linux
Stop criteria(s):Several procedures and stop criteria, the last one with 20 hours.
Submission date: 2024/10/20

Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 480
Optimal results: 81 (16.88%)
Upper Bounds: 480
- Average deviations:
- over CPM: 1025.07%
- over best LB: 11.89%
- over best UB: 7.59%
- Best Known: 97 (20.21%)
- Closed (using best LBs): 82 (17.08%)
- Sum of time units: 350353
- Open time units:
- to LBs: 31793 (9.98%)
- to UBs: 21895 (6.67%)
Lower Bounds: 480
- Average deviations:
- over CPM: 916.10%
- below best LB: 1.30%
- below best UB: 4.74%
- Best Known: 331 (68.96%)
- Closed (using best UBs): 109 (22.71%)
- Sum of time units: 315376
- Open time units:
- to LBs: 3184 (1.00%)
- to UBs: 13082 (3.98%)
Date