Results File
Dataset
File Header
Author(s): Demeulemeester, E. and Herroelen, W.
Reference:Demeulemeester, E., & Herroelen, W. (1992). A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem. Management Science, 38(12), 1803-1818. http://www.jstor.org/stable/2632711
Date: 1992/01/01
Hardware / software: i7, 16GB, 2GHz, C++, Visual Studio 2015 (x64), Windows 10
Stop criteria: 1 second(s)
Submission date: 2016/01/01
Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 110
Optimal results: 110 (100.00%)
Upper Bounds: 110
- Average deviations:
- over CPM: 18.04%
- over best LB: 0.00%
- over best UB: 0.00%
- Best Known: 110 (100.00%)
- Closed (using best LBs): 110 (100.00%)
- Sum of time units: 3835
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Lower Bounds: 110
- Average deviations:
- over CPM: 18.04%
- below best LB: 0.00%
- below best UB: 0.00%
- Best Known: 110 (100.00%)
- Closed (using best UBs): 110 (100.00%)
- Sum of time units: 3835
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Instances: 110
Optimal results: 110 (100.00%)
Upper Bounds: 110
- Average deviations:
- over CPM: 18.04%
- over best LB: 0.00%
- over best UB: 0.00%
- Best Known: 110 (100.00%)
- Closed (using best LBs): 110 (100.00%)
- Sum of time units: 3835
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Lower Bounds: 110
- Average deviations:
- over CPM: 18.04%
- below best LB: 0.00%
- below best UB: 0.00%
- Best Known: 110 (100.00%)
- Closed (using best UBs): 110 (100.00%)
- Sum of time units: 3835
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Date