Pat_DH

Results File
Dataset
File Header

Author(s): Demeulemeester, E. and Herroelen, W.
Reference: Demeulemeester, E. and Herroelen, W. (1992). A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38:18031818.
Date: 1992/01/01
Hardware / software: i7, 16GB, 2GHz, C++, Visual Studio 2015 (x64), Windows 10
Stop criteria: 1 second(s)
Submission date: 2016/01/01

Statistics
New results:
91 new lower bounds
110 new upper bounds
110 new optimal solutions
19 new closed instances
182 open instances updates (upper and lower bounds)
Results saved in sites/default/files/datasets/Patterson.csv
BKS saved in sites/default/files/datasets/Patterson_BKS.csv
Instances: 110
Optimal results: 110 (100.00%)
Upper Bounds: 110
- Average deviations:
- over CPM: 18.04%
- over best LB: 0.00%
- over best UB: 0.00%
- Best Known: 110 (100.00%)
- Closed (using best LBs): 110 (100.00%)
- Sum of time units: 3835
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Lower Bounds: 110
- Average deviations:
- over CPM: 18.04%
- below best LB: 0.00%
- below best UB: 0.00%
- Best Known: 110 (100.00%)
- Closed (using best UBs): 110 (100.00%)
- Sum of time units: 3835
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)