MM100_CV

Results File
Dataset
File Header

Author(s): Coelho J., Vanhoucke M.
Reference: Coelho J., Vanhoucke M. 2011. 'Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers', European Journal of Operational Research 213, 1: 73 - 82.
Date: 2011/01/01
Hardware / software: Stevin Supercomputer Infrastructure, C++, compiler intel/2017.02, Linux
Stop criteria:cumulated results from several runs, on open instances only. Maximal run: 10 runs x 500k schedules
Submission date: 2017/5/26

Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 540
Upper Bounds: 540
- Average deviations:
- over CPM: 22.58%
- over best LB: 2.77%
- over best UB: 1.02%
- Best Known: 373 (69.07%)
- Closed (using best LBs): 268 (49.63%)
- Sum of time units: 24256
- Open time units:
- to LBs: 769 (3.27%)
- to UBs: 207 (0.86%)
Date