J30_DH

Results File
Dataset
File Header

Author(s): Demeulemeester, E. and Herroelen, W.
Reference: Demeulemeester, E. and Herroelen, W. (1992). A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38:1803-1818.
Date: 1992/01/01
Hardware / software: Stevin Supercomputer Infrastructure, C++, compiler intel/2017.02, Linux
Stop criteria(s): 60 second(s)
Submission date: 2017/5/19

Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 480
Optimal results: 480 (100.00%)
Upper Bounds: 480
- Average deviations:
- over CPM: 13.37%
- over best LB: 0.00%
- over best UB: 0.00%
- Best Known: 480 (100.00%)
- Closed (using best LBs): 480 (100.00%)
- Sum of time units: 28316
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Lower Bounds: 480
- Average deviations:
- over CPM: 13.37%
- below best LB: 0.00%
- below best UB: 0.00%
- Best Known: 480 (100.00%)
- Closed (using best UBs): 480 (100.00%)
- Sum of time units: 28316
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Date