Results File
Dataset
File Header
Author(s):Strck, Christian
Reference:Strck, Christian (2018) Exakte Methoden und Matheuristiken fr das Multi-Mode Resource-Constrained Project Scheduling Problem (Exact and matheuristic approaches for the multi-mode resource-constrained project scheduling problem), Dissertation (Helmut Schmidt University Hamburg), Wissenschaftlicher Verlag Berlin, Berlin.
Date:20.02.2018
Hardware / software:Intel Xeon X5650 Prozessor, 2,66 GHz, C#, Visual Studio 2015 (x64), IBM ILOG CPLEX 12.6.3
Stop criteria:maximum of 1800 seconds
Submission date:23.04.2018
Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 540
Lower Bounds: 540
- Average deviations:
- over CPM: 18.67%
- below best LB: 0.22%
- below best UB: 1.66%
- Best Known: 498 (92.22%)
- Closed (using best UBs): 388 (71.85%)
- Sum of time units: 23476
- Open time units:
- to LBs: 72 (0.31%)
- to UBs: 572 (2.38%)
Instances: 540
Lower Bounds: 540
- Average deviations:
- over CPM: 18.67%
- below best LB: 0.22%
- below best UB: 1.66%
- Best Known: 498 (92.22%)
- Closed (using best UBs): 388 (71.85%)
- Sum of time units: 23476
- Open time units:
- to LBs: 72 (0.31%)
- to UBs: 572 (2.38%)
Date