Results File
Dataset
File Header
Author(s): Debels, D. and Vanhoucke, M.
Reference: Debels, D. and Vanhoucke, M. (2007). A decomposition-based genetic algorithm for the resource-constrained project scheduling problems. Operations Research, 55:457-469.
Date: 2007/01/01
Hardware / software: Stevin Supercomputer Infrastructure, C++, compiler intel/2017.02, Linux
Stop criteria:cumulated results from several runs, on open instances only. Maximal run: 100 runs x 500k schedules
Submission date: 2017/5/21
Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 425
Upper Bounds: 425
- Average deviations:
- over CPM: 830.80%
- over best LB: 4.45%
- over best UB: 0.00%
- Best Known: 425 (100.00%)
- Closed (using best LBs): 62 (14.59%)
- Sum of time units: 240853
- Open time units:
- to LBs: 10086 (4.37%)
- to UBs: 0 (0.00%)
Instances: 425
Upper Bounds: 425
- Average deviations:
- over CPM: 830.80%
- over best LB: 4.45%
- over best UB: 0.00%
- Best Known: 425 (100.00%)
- Closed (using best LBs): 62 (14.59%)
- Sum of time units: 240853
- Open time units:
- to LBs: 10086 (4.37%)
- to UBs: 0 (0.00%)
Date