J18MMpsplib

Results File
Dataset
File Header

Author(s)A. Sprecher / A. Drexl
ReferenceSolving Multi-Mode Resource-Constrained Project Scheduling Problems by a Simple, General and Powerful Sequencing Algorithm. Part I: Theory and Part II Computation. Research Reports 385 and 386, Institut fuer Betriebs-wirtschaftslehre, Christian-Albrechts-Univeritaet zu Kiel.
Date2/15/96
Hardware / software"Computer : IBM compatible Personal Computer, Processor : 80486 dx, Clockpulse : 66 MHz, Operating System : OS/2, Memory Code : 100 KB, Memory Data : 8 MB, Language : GNU C. The solutions values are obtained by an heuristic method."
Stop criteriano limit
Submission date2/15/96

Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 552
Optimal results: 552 (100.00%)
Upper Bounds: 552
- Average deviations:
- over CPM: 18.32%
- over best LB: 0.00%
- over best UB: 0.00%
- Best Known: 552 (100.00%)
- Closed (using best LBs): 552 (100.00%)
- Sum of time units: 14664
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Lower Bounds: 552
- Average deviations:
- over CPM: 18.32%
- below best LB: 0.00%
- below best UB: 0.00%
- Best Known: 552 (100.00%)
- Closed (using best UBs): 552 (100.00%)
- Sum of time units: 14664
- Open time units:
- to LBs: 0 (0.00%)
- to UBs: 0 (0.00%)
Date