Boctor50_CV

Results File
Dataset
File Header

Author(s): Coelho J., Vanhoucke M.
Reference: Coelho J., Vanhoucke M. 2011. 'Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers', European Journal of Operational Research 213, 1: 73 - 82.
Date: 2011/01/01
Hardware / software: Stevin Supercomputer Infrastructure, C++, compiler intel/2017.02, Linux
Stop criteria:cumulated results from several runs, on open instances only. Maximal run: 100 runs x 500k schedules
Submission date: 2017/5/26

Statistics
Nothing changed since there are no new lower bounds, upper bounds nor optimal solutions.
Instances: 120
Upper Bounds: 120
- Average deviations:
- over CPM: 22.74%
- over best LB: 22.74%
- over best UB: 0.00%
- Best Known: 120 (100.00%)
- Closed (using best LBs): 0 (0.00%)
- Sum of time units: 33819
- Open time units:
- to LBs: 6309 (22.93%)
- to UBs: 0 (0.00%)